BOC Gas Facility — Stapylton

Industrial Electrical — HV/LV Underground & Site Lighting
HV/LV underground pathways and site lighting installation for BOC's industrial gas facility at Stapylton, QLD.

Project Details:

SMG Electrical was engaged by BOC Gas to complete the electrical infrastructure for their new industrial gas facility at 222-298 Stapylton Jacobs Well Road, Stapylton QLD. The scope of works included the design and installation of high voltage (HV) and low voltage (LV) underground cable pathways throughout the site, ensuring compliant and reliable power distribution to all facility assets. SMG also completed the full installation of the site lighting system, delivering safe and efficient illumination across the facility grounds, access roads, and operational areas. All works were carried out in strict accordance with Australian Standards and BOC site-specific safety and compliance requirements.

Project gallery

No items found.
BOC Gas
Industrial Client, Stapylton QLD